Escape Trunk, Cofferdam & Cradle
Project Detail: The project included (3) basic items: Logistics Escape Trunk (L.E.T.), Cofferdam and L.E.T. Cradle. The basic size of the LET was 12 ft by 12 ft by 8’-6

Project Detail: The project included (3) basic items: Logistics Escape Trunk (L.E.T.), Cofferdam and L.E.T. Cradle. The basic size of the LET was 12 ft by 12 ft by 8’-6

Over the years HPS has provided a wide range of fabricated items to our client from small part carriers to complete salt bath furnace systems.In this record we will address

Project Details: The existing Ore Bridge; a large gantry crane used to off load taconite pellets from lake freighters, was retro fit with a platform system to access and service the

HH60 Aircraft Maintenance Stands to include a left hand and right hand stand for access to each side of the aircraft during PDM. HPS reviewed the scope of work and

Project Details: HPS was contracted to fabricate a replacement upper lifting frame. The lift frame has a design lifting/support capacity of 25 ton (50,000 pounds). The new designed upper frame

Project Detail: Project included the fabrication of (4) Brows constructed of 6061-T6 structural grade aluminum.Two (2)Brows are 35 feet in length and the remaining (2) are 40 feet in length

Project Details: Project includes RDF (Refuse Derived Fuel) fuel feed equipment for use with a Fluidized Bed Boiler. Main components of the feed equipment included, Feed hopper charging ram assembly,

With 23 years experience, HPS provides complete fabrication and assembly of various Salt Bath Furnace Systems. What makes a Salt Bath System? Size: Most systems consist of a salt bath

Project Details: HPS has a long standing relationship with our client providing complete fabrications and assembly of rotary grate stokers. This project included (3) main areas: (1) Stoker Frame; (2)